At the Environmental Scientifics Group, we pride ourselves on working in partnership with customers to deliver practical solutions. We work hard to understand customer needs and have a long standing reputation of delivering excellence. We value our relationships and because of that, many of our 5000-plus customers are willing to act as references for our work. A small selection of these can be seen here.
Geotechnical and Energy Services Division:
| Customer/Project | Abstract |
|---|---|
| Greater Gabbard Offshore Winds Ltd | Interpreting ground conditions for trenchless technologies. Contracted by a Fluor/Airtricity joint venture to provide an interpretative report on the strata beneath the shoreline for the offshore/on-shore cable connection at Sizewell, Suffolk, Soil Mechanics' integrated approach which included geophysical and geotechnical investigations were well suited to meet the demands of this project. View more |
| Pembroke CCGT Power Station | RWE npower needed to build a new 2000 megawatt combined cycle gas turbine (CCGT) power station at Pembroke, Wales on a site previously occupied by a former oil-fired power station. The new CCGT plant would be constructed on the former power station site and the main buildings would be located on the low lying ground to the south west of the former oil-fired power station. View more |
| Berkeley Power Station | Berkeley Power station was proceeding through a measured and calculated programme of work to decommission the site efficiently and with due care for the environment. We were challenged to provide geotechnical information that would enable the design of foundations for a proposed intermediate level waste storage Facility (ILW store). View more |
| Uskmouth Power Station | Severn Power Ltd needed to build a new 800 MW power station at Uskmouth, Near Newport, South Wales on a demolition site previously occupied by the old coal fired ‘Station A’ power station built in the 1950s. The geology of the site comprised up to 30m of often soft alluvial soils overlying Mercia Mudstone bedrock. View more |
| Waverley Railway Regeneration | Soil Mechanics was appointed by Scottish Borders Council to meet a wide variety of drilling and testing techniques, logistical challenges, land access organisation and logging requirements along a 35 mile stretch of track earmarked for reinstatement by 2011. View more |
| M25 | With an immediate need to finish the pavement investigation along its entire 117 mile stretch against unyielding time pressures the Highways Agency needed a geotechnical contractor who could complete the field work in under 8 weeks so that year end financial targets for a possible widening scheme could be met. View more |
| Medway Viaduct Refurbishment | The Highways Agency needed a solution to ensure the future life of the Medway viaduct and solve their need for a high capacity crossing. Given the concerns over potential chloride attack from road salt penetration into the deck of the old viaduct a detailed survey covering the entire 1km was required to evaluate the extent of the damage. View more |
| New Wembley | Soil Mechanics challenge was to investigate the integrity of existing and new foundations and complete nine phases of site work on the 90 acre Wembley City scheme. A variety of drilling and testing needs were met for the assessment of man-made and natural strata. View more |
| Thames Gateway | Soil Mechanics was appointed by Transport for London (TfL) to obtain information on the soil, rock and ground water conditions fro three different locations. View more |
| Southwest Strategic Regional Coastal Monitoring | Required to provide sea bed levels for Teignbridge District Council, SM Pelorus had to carry out a monitoring programme incorporating 7 different survey disciplines ranging from aerial surveys to bathymetric and tidal surveys. View more |
| Estuary bathymetric survey | As part of an environmental study of the River Dee estuary between the North Wales and Wirral coastlines SM Pelorus have completed a second bathymetric survey. View more |
| Churngold Recyling | TCRA has well developed testing requirements in accordance with the WRAP (Waste and Resources Action Programme) protocols. To help them meet the requirements Soil Mechanics Materials Testing Division worked to an agreed program of chemical and product conformance testing. View more |
| Burbo Offshore Windfarm | The survey brief includes monitoring scour around the turbine monopile bases together with cable burial surveys and current monitoring in the vicinity of a single monopile. Two surveys are programmed per year with the option to include additional surveys if required. View more |
| Harwell Western Storage | CL Voelcker's challenge involved remediation strategies, risk assessments, operational envelopes and the Waste Management Plan. View more |
| Former Fuel Transfer Depot - Newbury | As part of the redevlopment of the site CL Voelcker developed a remediation strategy. View more |
| Environmental Impact Assessment | An Environmental Impact Assessment (EIA) for the redevelopment of the town of Shirley undertaken by CL Voelcker. View more |
| Caythorpe Gas Storage Facility | Working with Warwick Energy Ltd to produce and submit the IPPC application to the Environment Agency for change in activities from gas extraction to gas storage. View more |