With UKAS accredited laboratories across the UK, ESG can undertake the full range of asbestos surveys adhering to the latest HSE guidance. This includes asbestos bulk sampling and asbestos analysis in accordance with ISO17020 and ISO17025 and the techniques set out in HSG248 and HSG264.

 

Asbestos Management Survey
This is the standard asbestos survey that should be carried out for the continued management of asbestos in premises. The purpose of the survey is to locate, as far as reasonably practicable, the presence and extent of any suspect ACMs in the building and assess their condition. Although sampling is the most common approach that has been used for surveys, an asbestos management survey can also involve presuming the presence or absence of asbestos.

An asbestos management survey can therefore be completed, using a combination of sampling ACMs and presuming ACMs or, indeed, just presuming. Any materials presumed to contain asbestos must also have their condition assessed (ie material assessment).

Asbestos management surveys may involve minor intrusive work and some disturbance. The extent of intrusion will vary between premises and depend on what is reasonably practicable for individual properties – agreement on this aspect of the survey should be reached between the client/dutyholder and the surveyor. Factors that can affect the extent of intrusion include the type of building, the nature of construction, accessibility etc.

Refurbishment and Demolition Surveys
This survey is used to locate and describe, as far as reasonably practicable, all ACMs in the area where the refurbishment work will take place or in the whole building if demolition is planned. The survey will involve destructive inspection as necessary, to gain access to all locations, including those that may be difficult to reach. Refurbishment work may vary from relatively small to large projects. Small scale work may occur in different parts of a building at different times over several years. A full asbestos sampling programme is undertaken in these areas to identify possible ACMs and to obtain estimates of the volume and surface area of the ACMs present. The survey is primarily designed to identify ACMs so that they can be removed in preparation for the refurbishment or demolition. Some advice is offered on the types of ACMs that it is permissible not to have removed prior to demolition.

It is possible to use the two survey types in different parts of a building particularly where refurbishment work is in a limited area. Due to the intrusive nature of refurbishment and demolition surveys, it is recommended that the areas affected are not occupied at the time of the asbestos survey taking place.

Bulk Analysis
A representative sample of the material, suspected to be asbestos containing, is collected during the survey.

In the analytical laboratory, this is visually examined, followed by a more detailed examination by stereo microscope. One or more representative sub samples are prepared mechanically and or chemically for further examination. Fibres observed in the course of the examination are categorised tentatively on the basis of morphology and certain physical properties. Each fibre type recognised is sampled by selecting a few fibres or bundles and these are mounted in a refractive index liquid to match the most likely asbestos type. The fibres are then positively identified as one of the six regulated types on the basis of their detailed optical properties using polarised light microscopy.

Asbestos Statutory Re-inspections
Additionally, ESG's qualified surveyors will perform a thorough visual inspection of the asbestos containing materials identified in the asbestos register in accordance with ACoP L127. Risk changes are recorded and the management plan updated. Recommendations for new control measures are given where required.
 

For more information about ESG Asbestos Ltd and the servies we provide, please contact us.

Registered office: ESG House, Bretby Business Park, Ashby Road, Burton on Trent, DE15 0YZ. Incorporated in England: 02880501 | Disclaimer | Developed by DDME | Design by Carrick

News

Tuesday 22 November 2011

ESG awarded an industry first with glowing references

ESG become the UK’s first company to gain UKAS accreditation for maintained load testing Environm...

Thursday 03 November 2011

ESG achieves 12 months without a reportable or lost time accident

Environmental Scientifics Group (ESG), the UK’s leading environmental compliance and fo...

Friday 21 October 2011

ESG Henley Water is ‘Supplier of the Year’ finalist at Norland Supply Partner Event

‘Highly commended’ status awarded by Norland contract manag...

Tuesday 04 October 2011

ESG offers enhanced asbestos services

Full UKAS accredited quantification service for analysing asbestos in soils and aggregates saves time and money 03 Octo...

Monday 03 October 2011

ESG helps premiership rugby club to stay on top

Bedwas Rugby Club retain coveted place and provide fans with additional standing 03 October 2011 – Envi...

Thursday 29 September 2011

ESG appoints Group HR Director

Environmental Scientifics Group (ESG), the UK’s leading provider of testing, inspection and compliance services is please...

Wednesday 28 September 2011

ESG expands food testing capabilities

Next-day nutritional chemistry testing service launched Environmental Scientifics Group (ESG), the UK’s leading p...

Thursday 07 July 2011

ESG acquires Leeds-based microbiological laboratory, PMS Micro Limited

ESG extends range of services for its Food Division and provides access to new markets ...

Thursday 07 April 2011

MP for South Derbyshire, Heather Wheeler opens new ESG superlab

State of the art facilities provide unrivalled analytical and laboratory testing services En...

Wednesday 06 April 2011

ESG joins Nuclear Industry Association

Supporting developments throughout the industry lifecycle Environmental Scientifics Group (ESG), the UK’s leadin...

More...

Testimonials

ESG through its Soil Mechanics brand were set a tough challenge by RWE npower and met it full on. From the engineer's perspective, it was evident from the start that many parts of the business would need to pull together to achieve the client's demanding programme. Pembroke in November was never going to be easy, but staff on site, in Bridgend and in the labs demonstrated a team commitment to match and on occasions exceed the client's expectations.

RWE npower